so far i think my progress has been okay. looking back on the works i did for TOTL i dont think it has been excellent, but i dont think progress was terrible.



the things that went well:

All warehouse models are done with modeling, we are well underway texturing the props (though that will be under two of our texture artists to be doing)


more graphic designs are done, roughly 10, bringing us up to around 40(though not all will probably make it to the screen)


All of our Mocap is finished recording. we need to fix up the animations, and our rigger is well underway with rigging the models



improvements needed:

I am working on the hero buildings for the film, so far i have done 2 out of the scheduled 10.


progress has bottlenecked however. i think i am lacking inspiration or drive to do it, but i've got a whole team that depends on my modeling to be done.


this sunday i should have 5 buildings done.


other outside of class events do cause stunt in my progress, most of which i cannot control.


outside of my work, we need to do more. Our main 2 problems in my opinion are some characters and the city. the city is such a large task that requires more than just me to be working on the buildings, and while we do have multiple props for the city, part of me worries about making sure things are done on time.


our other problem is the primadonna character. so far, two different people have signed up to work on her, and neither one has given either me or Vi any progress, so i do worry about that too.



overall though i think we have made good progress. i am happy to say the warehouse is fully finished albiet needs lighting and final textures, but our texturing team is very good at completing things in a deadline so im not too worried.

 
 
 